Pricing

Service Pricelist

Indicative prices for our concrete construction services. Final pricing depends on project scope and is confirmed after a free on-site assessment.

All prices are indicative and depend on project scope, access and site conditions. Final pricing is confirmed in a written quotation after a free on-site assessment. VAT will be added where applicable.

Discount window

Discounts apply between 8:00 and 19:00 (as advertised).

Night call-out

From 19:00 to 8:00, a call-out fee of €10 is added to the invoice.

Transport within Tallinn is free from 8:00 to 19:00.

Quality commitment

We guarantee high quality. We deliver services through clear planning, up-to-date methods, modern equipment and materials, and skilled staff.

Foundations

ServiceUnitPrice (€)
Strip Foundation Constructionper mfrom €45
Pile Foundation Concretingper pilefrom €120
Bored Pile Concretingper pilefrom €180
Foundation Concretingper m³from €140
Monolithic Slab Foundationper m²from €55
Reinforced Pile Installationper pilefrom €150
Pile & Grid Concretingper m²from €65

Structural Elements

ServiceUnitPrice (€)
Monolithic Concrete Staircasesper stepfrom €180
Wall & Ceiling Concretingper m²from €60
Monolithic Columnsper unitfrom €250

Floors

ServiceUnitPrice (€)
Industrial Floorsper m²from €35
Leveling Layer Pouringper m²from €18

General Concrete Works

ServiceUnitPrice (€)
Concrete Pouringper m³from €130
Minor Concrete Worksper projectfrom €300

Repair & Waterproofing

ServiceUnitPrice (€)
Concrete Restorationper m²from €40
Waterproofingper m²from €25

VAT is added to all services.

Discounts apply from the second hour!

General Terms

  • The minimum service fee is the price of the first hour of work.
  • Services not listed are priced separately.
  • Prices for large-scale projects are negotiable.
  • Discounts do not apply to expert assessments or concrete quality testing.
  • Preparing an official report is arranged separately, prices starting from 15+km.
  • Discounts do not apply to outdoor works (foundation, excavation and groundwork, etc.).
  • Hourly rates apply to one specialist. If two or more people are required, time is calculated accordingly.
  • If work machinery must use paid parking, the actual parking cost will be added to the invoice. You will be notified in advance.

NB! Hourly billing is calculated per one worker unless agreed otherwise.

Call us 24/7 for emergencies and bookings.